Our Projects

Projects Table – DAMRA Consulting Engineers

Company Track Record

Project Experience

Contracts completed and in progress — last 5 years

No. Name of Project & Description Role Employer Status
01 Asfaw Meda Infrastructure & Access Road Construction Supervision of Sport Field, Café, Office, Guard House, Toilet & Fence — Woreda 10, Addis Ababa Design & Construction Supervision Addis Ketema Sub-City Construction Office Completed
02 Butajira City — Grand Mosque–Netsa Sefer–Ziway Road Detail Design Review & Construction Supervision, Phase II, 2.4 km & 26 m wide, Asphalt Concrete Detail Design & Supervision Butajira City Municipality Completed
03 Butajira City — Ring Road–Hospital Gubre Asphalt Detail Design Review & Construction Supervision, 1.74 km & 20 m wide, Asphalt Concrete Design Review & Supervision Butajira City Municipality Completed
04 Butajira City — Warkasefer–Muslim Cemetery–Arab Gebeya Detail Design Review & Construction Supervision, 2.6 km & 26 m wide, Asphalt Concrete Design Review & Supervision Butajira City Municipality Completed
05 Butajira City — Tele Front of Woreda Police Station Detail Design Review & Construction Supervision, 0.45 km & 20 m wide, Asphalt Concrete Design Review & Supervision Butajira City Municipality Completed
06 Butajira City Internal Asphalt Road — Grand Mosque–Netsa Sefer–Ziway (Phase II) Detail Engineering Design, Feasibility Study, RAP & Geotechnical Investigation, 2.4 km & 26 m wide Detail Eng. Design, Feasibility, RAP & Geotech Butajira City Municipality Completed
07 Butajira City — Tele Front of Woreda Police Station (Phase II) Detail Engineering Design, Feasibility Study & Geotechnical Investigation, 0.45 km & 20 m wide Design Feasibility & Geotech Investigation Butajira City Municipality Completed
08 Kereb River Bridge & Approach Road / Wuran Funa School Detail Engineering Design, Bridge Length 25 m, Width 7.3 m — Muhr Ena Aklil Woreda, SNNPR Detail Design Kereb Bridge & Wur Afuna School Construction Project Coordinator Completed
09 9 Bridges — Butajira City Municipality Detail Engineering Design & Tender Document Preparation of 9 bridge projects (Back to Synodos, Near Abubeker Mosque, Low Cost House River, Maremia River, Ticho River, Beresa River, Hatu River, Sheh Gragn Cemetery, Stadium Bridge) Detail Design Butajira City Municipality Completed
10 Jigjiga City Internal Asphalt Road Detail Engineering Design, Feasibility Study & Geotechnical Investigation, 4.0 km & 40 m wide Detail Design Jigjiga City Administration City Service Office Completed
11 Soddo Christian General Hospital — Internal Asphalt Pavement & Car Parking Design Consultancy, 1.0 km, DS4 Asphalt — Wolayita Soddo Design Soddo Christian Hospital Completed
12 Package River Bridge Projects — LOT II (SNNPR South Road Authority) Construction Supervision, Gubre, Dila, Hosana, Guber, Sodo & Arbaminch Districts — 25 T-Girder bridges Construction Supervision SNNPR South Road Authority Completed
13 Muketuri–Alemketema Road — Lot I: Muketuri–Kokebmesk Continuation of Construction Supervision, 58.825 km, Asphalt Concrete — Addis Ababa Construction Supervision Ethiopian Road Administration In Progress
97.63%
14 Jigjiga Bypass Road Project Construction Supervision, 6.93 km, 30 m wide, Asphalt Concrete, 1 RC T-Girder bridge (90 m) Construction Supervision Ethiopian Road Administration In Progress
79%
15 Two Heavy Road Maintenance Projects — Alemgena RNSMBD Ejere–Arambute–Shenkora Yohannes & Mazoria–Bojober, 46.5 km, Natural Gravel Construction Supervision Ethiopian Road Administration In Progress
75%
16 Dubti–Arissa–Adigala–Beyokobeb Road — Lot 2: km 72+000–150+000 Design & Build Road Project, 78 km, 10–21 m wide, Asphalt Concrete & DC-5 Design & Construction Supervision Ethiopian Road Administration Completed
17 Shabeelay Resort Access, Internal Connecting Roads & Hiking Trails Detail Engineering Design & Tender Document Preparation, 13.3 km, Asphalt Concrete & Rigid Pavement & 5 small Dams Detail Design & Tender Preparation Ethiopian Road Administration In Progress
85%
18 Togochale Junction–Jigjiga Airport–Hoodley Kebele Road Detail Engineering Design & Contract Document Preparation, 10.02 km & 40 m wide, Asphalt Concrete Detail Design & Tender Preparation Ethiopian Road Administration In Progress
85%
19 Asebot Monastery Junction to Asebot Monastery — Asphalt Concrete Upgrading Road Feasibility EIA Study, Detail Engineering Design & Tender Document Preparation, 16 km & 7 m wide Feasibility, EIA, Detail Design & Tender Asebot Debre Wegeg St. Trinity & Abune Samuel Unity Monastery Office Completed
20 Tare 3 (12 m span) & Tare 4 (12 m span) Special Structure Bridge Design & Feasibility Study — Arbegona Woreda, Sidama Region Design & Feasibility Study Sidama National Regional State Road Development & Transport Bureau Completed
21 Kenera 01–Funano Korcho Road / Boa–Hayilo–Lelo / Industry Park–Qalite–Simita / Mae School–Abaye Road Design & Feasibility Study, total 20.39 km — Gorche & Dale Woredas, Sidama Region Design & Feasibility Study Sidama National Regional State Road Development & Transport Bureau Completed
22 CMC Junction–Summit Medihanalem & Goro–CMC Overpass Bridge Junction–Summit Road Construction Supervision, 3.2 km & 20 m wide, Asphalt Concrete — Addis Ababa Construction Supervision Addis Ababa City Roads Authority In Progress
Ongoing
DAMRA Consulting Engineers PLC — Category-1 Registered, Ministry of Construction, Ethiopia  |  Valid to 02/08/2027  |  Reg. No. CM/288
Supervision Construction supervision & contract administration
Design Detail engineering design & tender preparation
Design & Sup. Both design and supervision services
Feasibility Feasibility study, EIA, RAP & geotechnical

ADDIS ABABA CITY ROAD AUTHORITY CMC GORO SUMMIT ROAD

SHEBELE “Dine for Generation” (Gebeta Le Tewled) initiative

Butajira City — Road

Asfaw Meda Infrastructure & Access Road

SIDAMA ROAD AUTHORITY 4 ROADS & 2 BRIDGES